The roof on the Pool Pump House developed leaks that were dripping below in the pump house onto the computer panel of the automated chlorine and chemical replenishment system. All the ferns were removed from the roof (photo 1) workman then fiber glassed and applied a Firestone asphalt roof cover and heat torched the seams together (photo 2). Finished roof is water proofed (photo 3).